
Florida Power and Light (Nokia)
Maverick is the designated engineering contractor for Florida Power and Lights Grid Modernization Fiber to the Sub Station Project throughout the State of Florida. Maverick handles all aspects of the project from creation of the Engineering Guidance and FEED study, High Level design, Low Level Design Construction and Field survey, Rights and Permits, Environmental, SHPO.

Statoil North America
Maverick was selected to perform the Engineering FEED study for the Statoil Marcellus and Utica Assets for a Fiber to The Well solution. The project covered three areas; North Monroe County Ohio-Utica Assets, South Monroe County Ohio- Marcellus Assets and Taylor County West Virginia- Marcellus Assets. Maverick has completed three separate FEED studies and the design and engineering.

Yampa Valley Electric Association
Rural Fiber to the Home – Maverick is the awarded Design Build Contractor for Yampa Valley Electric Association Fiber to the Home Build, “Luminate”. The build covers three rural areas in Colorado: Steamboat Springs, Hayden, and Craig.

Shentel Virginia
Rural Broadband Fiber to the Home – Maverick is currently the sole engineering firm for a 700+ mile FTTx project, comprising of both fiber to the home, microwave, and RF solutions. The project incorporates engineering more than 7,000 homes: high level design, field surveys, low level design, constructability ride out, value engineering, civil permits, construction drawings, and GIS services. The rural broadband project encountered multiple franchise jurisdictions for both incumbent and competitive services for the end customers.

Black & Veatch - Verizon
Maverick was contracted as the Engineering partner to perform design, fielding, permitting, and construction package delivery for an enterprise ODN application, utilizing fiber to the business approach through GPON. Maverick has to date completed over 242 km of engineering, permitting, and construction drawings. The project encountered more than 15 permitting jurisdictions to provide services for a competitive carrier entrant to the greater Tampa markets.

Massachusetts Bay Transportation Authority
Maverick was selected to perform the Engineering and Construction for the Massachusetts Bay Transportation Green Line Engineering and Construction fiber optic from Riverside to Kenmore Station. After Maverick conducted the initial FEED study, Maverick re-designed the Network to conform to NESC Code. Maverick also worked with the Safety Department to define work rules and safety practices to work during normal train and rail use which allowed the installation of the Fiber to occur in less than 8 weeks.

BAI Communications – Trackside Fiber Network, Engineering and Consulting
Maverick is a designated Engineer of the New Fiber Network and Trackside Solution for BAI Communications in Boston.

National Passenger Railroad Corporation (Amtrak)
Amtrak selected Maverick as the prime contractor to design, install, and commission a Trackside Train to Ground Wireless Broadband Network for Amtrak’s Northeast Corridor “NEC (Northeast Corridor)” from Washington DC to Boston Massachusetts (450 Miles). Maverick has completed aa 50 Mile section to date from Delaware to 30th Street Station in Philadelphia. Maverick maintains the Master Services agreement with Amtrak as they release sections of the project as funding allows.

Eversource (formerly NSTAR) – 4 KV-13 KV Design Build
Maverick was responsible for the design build of the Electrical Split Fiber Main conversion from 4 kV.

Eversource Electric – Electric Vehicle Design Build Massachusetts
Maverick was selected to perform the Design Build for Eversource Electric Vehicle Project.

Eversource Electric – Colburn Street Substation, Underground Electric
Maverick installed over 27 miles of 700 flat strap cable within the City of Boston – Over 360 Sets of Splices and zero failures. The work was completed during the winter at night within a period of 3 months. The project was completed on time and on budget.

Crown Castle – New Customer Connect, Underground Electric
Maverick designed all new secondary connections from the Eversource System to the New Crown Castle Small Cell sites. Includes all site surveys, manhole inspection and rights and permits.